From single-structure teardowns to large-scale industrial clearances — our work speaks for itself.
A full 4-building industrial complex teardown spanning 3.2 acres in southeast Columbus. The project required coordinated asbestos abatement, utility demolition, and complete site grading delivered over a compressed 6-week timeline to meet the client's development schedule.
Complete demolition of a 12,000 sq ft strip mall in Westerville, including slab removal and site backfill.
Mass excavation for a 6-story mixed-use development foundation in downtown Columbus, including shoring coordination.
Full teardown of a 2-building warehouse complex including structural steel salvage and concrete breaking.
Demolition of 8 residential structures and site grading for a new townhome development in Hamilton County.
45-acre land clearing for a new industrial park in Licking County — vegetation removal, stump grinding, and grading.
Full decommissioning of a 120,000 sq ft manufacturing facility including environmental remediation and concrete removal.
Completed Projects
Sq Ft Demolished
On-Time Delivery
Major Safety Incidents
Real equipment, real crews, real results — captured from active job sites across the region.
Every Stonecrest project is backed by comprehensive insurance, regulatory compliance, and professional certifications.
Fully licensed as a commercial contractor in the State of Ohio and registered in all operating states.
Comprehensive general liability and workers' compensation insurance protecting clients on every project.
Certified for hazardous material handling and environmental compliance including asbestos and lead.
Every project supervisor holds OSHA 30-hour certification. Safety is non-negotiable at Stonecrest.